Product and Module Limitations

This page details technical and system limitations in BIM 360.

Module Limitation
Document Management Maximum number of files per folder: 10,000

Maximum number of sub-folder levels: 25

Maximum folders per sub-folder level: 1,000

Maximum total sheet number: 10,000 per folder

Maximum file size: 5TB

Maximum folder name length: 255 bytes

Maximum hyperlinks per sheet: 2,000

Maximum review approval workflows per project: 10,000

Maximum active reviews per project: 10,000

Maximum archived reviews per project: 200,000

Maximum rows in a review summary report: 20,000
Field Management Maximum number of photos per item: 10,000

Filtering limit for location and sublocations in Issues: 300

Checklist template maximum sections: 500

Checklist template maximum items per section: 500

Checklist template maximum items per template: 3,000

Checklist template maximum characters in title: 1,000

Checklist template maximum characters in section title: 75

Checklist template maximum characters in item title: 1,000

Checklist template maximum characters in item description: 1,000
Project Administration Maximum number of location tiers: 20

Project Management Maximum submittal items per project: 10,000

Maximum attachments per submittal item: 10,000

Maximum submittal attachment file size: 5TB

Maximum RFIs per project: 10,000

Maximum attachments per RFI: 10,000

Maximum RFI attachment file size: 5TB

Maximum meetings per project: 10,000

Maximum meetings per day per project: 100

Maximum meetings per series: 200

Maximum topics per meeting: 1,000

Maximum items per meeting: 1,000

Maximum meeting participants: 200

Maximum meeting item assignees: 20

Character limit per meeting topic: 100

Character limit per meeting item: 10,000
Insight Reporting limits for PDF issue details: 500 issues, 500 pushpin snapshots, 2,500 photos

Reporting limits for Excel issue summaries: 10,000

Reporting limits for PDF issue summaries: 1,000

Reporting limits for Excel checklist details: 10,000 checklists

Reporting limits for PDF checklist details: 500 checklists, 2,500 photos (checklist images), 20,000 checklist items

Reporting limits for Excel checklist summaries: 10,000 checklists

Reporting limits for PDF checklist summaries: 1,000

Reporting limits for Excel document logs: 20,000 documents, 100 custom attributes
Model Coordination Maximum models that can be displayed in the clash grid: 100

Maximum number of classified clashes: 250000

Maximum number of models in a view: 1000

Maximum number of models in a coordination space: 1000. This only applies to coordination spaces with automatic clash detection turned on.

Maximum number of active coordination spaces with clash detection turned on at any one time: 20

There is no limit on the total number of coordination spaces that can be created, but they can only be configured against 150 unique folders.

Only 3D RVT files, DWG files, tracked NWC files exported from Revit and AutoCAD verticals, tracked IFC files exported from AutoCAD (architecture, MEP, and Civil 3D 2018 and onwards), ARCHICAD, Revit, MagiCAD for Revit, Tekla Structures, Siemens NX, and Vectorworks are supported for coordination and clash detection.
Cost Management Budgets

Maximum budgets in a project: 10,000

Maximum budget subitems under a root budget: 500

Maximum date range resources under a root budget: 2,000

Maximum budget snapshots in a project: 300

Maximum manually created snapshots per 24 hours in a project: 5

Contracts

Maximum contracts in a project: 3,000

Maximum number of contracts imported in batch at once: 200

Maximum number of contracts created in batch at once: 200

Maximum SOV per contract: 3,500

Maximum SOV imports per contract: 1,500

Maximum SOV imports per main contract: 2,500

Maximum root SOV deletions per main contract: 10

Cost Items

Maximum cost items created in batch at once: 200

Maximum cost items deleted in batch at once: 50

Maximum cost subitems under a single type: 2,000

Maximum cost subitems created in batch at once: 500 and 5 depth levels

Maximum cost subitems copied from another tab (Estimated, Proposed, Submitted, Approved, Committed) of the same cost sub-items: 50

Payments

Maximum payment items in a payment: 3,500

Maximum billing period deletions in one batch: 10

Maximum payment applications under one billing period: 5

Maximum payment references under each payment application: 20

Expenses

Maximum expenses that can be grouped: 5,000

Maximum expenses per project: 100,000

Maximum expense items per project: 100,000

Maximum expense items per budget in the project: 4,000

Maximum expense items per expense in the project: 300

Maximum tax formula items in one tax formula: 7

Change Orders

Maximum change orders deleted in batch at once: 50

Maximum potential change orders deleted in batch at once: 50

General

Maximum items selected for status changes in contract, cost payment application, expense, change orders: 10

Maximum items selected for status changes in Expense: 50

Maximum characters in the Comments field: 1,000

Design Collaboration Packages containing locked files, or DWG files that have two or more xrefs with the same name, can't be shared.

Mobile App Limitations

AppleĀ® devices supported are iPhone 5s and above, all iPad Air models, all iPad Pro models, and iPad mini 2 and above. Please use iOS 12 or above for all AppleĀ® devices.