Bills Of Material

The drawing manager uses the current bill of material (BOM) to create tube and pipe drawings. When you migrate R9 or earlier tube and pipe drawings, specify whether to use the R9 BOM (default) or the current BOM.

The BOMs differ in how they store the raw material description for library parts:

For more information
Help topics

R9 or earlier BOM migration

Tube and pipe drawings