Document routes and runs.
- Category
-
Routed Systems
- Time Required
-
40 minutes
- Tutorial File Used
-
Accumulator.iam
Objectives
- Create a base view for a tube and pipe assembly
- Create a projected view
- Create a detail view
- Add general drawing dimensions
- Add Tube & Pipe-specific properties to the Bill of Materials table
- Add Base QTY and Stock Number to a parts list
- Create sketched symbols with piping style data and annotate drawings
Prerequisites
- Basic knowledge of Tube and Pipe assemblies.
- Basic knowledge of Autodesk Inventor drawings.
Navigation Tips
- Use Next or Previous at the bottom-left to advance to the next page or return to the previous one.
Next