Log files from tasks

Log files save the task processing information so you can understand how the task progressed.

Export errors from log file to Excel

The Task Scheduler log files track task errors. Then you can export the errors from the Task Scheduler .mdb file to an Excel file so that they are easier to discover and understand.

The Excel file generates a separate sheet for each error type. The first column of each sheet lists the error files. The second column lists the corresponding task names.

Log file information common to any task type

Error message

Recommended Action

Failed to open file using Apprentice Server.

Check the input files and verify that Autodesk Inventor LT can read the format of added files, and run the task again.

Before you start the task, open and save the input files in Autodesk Inventor LT.

File does not exist.

Verify that the input files exist in the destination folder just before the task runs. The contents of the folder can change from the time the task was scheduled to the time the task started to run.

File has unresolved references.

Clear the option Skip files with resolved reference in the Migration or Update task before you run the task.

Open the input file in Autodesk Inventor LT to set the file references correctly, save the document, and then run the task again.

File is read-only.

Remove the read-only property of input files and run the task again.

Log file information unique to task types

Migrate Files, Update Design

Log interpretation information

  • Open Time in seconds (column 5).
  • Update Difference between the number of comatose (column 5) and sick (column 6) features before and after the update.
  • Rebuild Difference between the number of comatose (column 5) and sick (column 6) features before and after the rebuild all.
  • Check Difference in the volume from when it was opened up to the point after the update and rebuild are done (column 5).
  • Save Time in seconds and the difference in file size (byte) before and after save (column 6).
  • Close Time in seconds (column 5).

Operations results table Operation types lead the rows and operation results lead the columns. The header and footer mention the build number before and after migration:

Operation column Specifies the sequence of the various operations Task Scheduler performs to process the task.

  • Open Opens the file in a migrated to version in Autodesk Inventor LT.
  • Update Updates the old file to the new Autodesk Inventor LT version. Regenerates only the geometry that has significant edits in memory. These edits could change the file size.
  • Check Checks for the mass properties before and after migration of the file.
  • Save Saves the file to the migrated version.
  • Close Closes the files after migration.
  • Purge Deletes the previous versions of the migrated file from the Old Version folder after the migration task ends.

Failures and Recommended Solutions

Operation That Failed

Cause of Failure

Recommended Action

Open

Active security tools or applications.

Disable the security tools and applications and then rerun the task.

 

Other applications are running when you begin the task.

Close any applications which could terminate the Autodesk Inventor LT Task Scheduler process, and then run the task again.

 

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again.

Update

Autodesk Inventor LT cannot update versions of files older than R6.

Verify that your files are in a version of R6 or later so that they are current enough to be updated.

 

Autodesk Inventor LT failed to update the files.

Rebuild the failed files in Autodesk Inventor LT to get more information about the failure. In Migration options, check Total Rebuild, and then run the task again.

Check

Mass properties before and after migration does not match.

Open the files in Autodesk Inventor LT and save them to migrate to the current version or get more information about the error.

Save

Another process is running that can use the files being migrated.

Close all processes that possibly use the added files, and rerun the task.

 

Files are set to nonwrite status.

Set write permissions on the files.

 

Use Rebuild instead of Update.

In the Migration options dialog box, select the Total Rebuild option, and then run the task again.

Close

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task.

Purge

Failure.

Purge the Old Versions folder manually after the migration task is finished.

Publish DWF Files, Export Files, Convert IDW to DWG

Operations results table Operation types lead the rows and operation results lead the columns:

Operation column Specifies the sequence of operations that Task Scheduler performs to process the task.

  • Get Translator Gets the appropriate translator in Autodesk Inventor LT based on the file type to prepare for translating the input file to a different output format.
  • Open Opens the file in the current version of Autodesk Inventor LT.
  • Export Translates the input file to the output format.
  • Close Closes the files after exporting.

Failures and Recommended Solutions

Operation That Failed

Cause of Failure

Recommended Action

Open

Active security tools or applications.

Disable the security tools and applications and then rerun the task.

 

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task.

Export

Failure.

Create an update task to rebuild the files, and then rerun the task.

Create an export task to export the files again.

Close

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and run the task again.

Print Files

Operations results table Operation types lead the rows and operation results lead the columns:

Operation column Specifies the sequence of operations that Task Scheduler performs to publish the file.

  • Open Opens the file in the current version of Autodesk Inventor LT.
  • Get Manager Gets the appropriate Autodesk Inventor LT Print manager API for printing the input documents.
  • Set Options Sets the print options and sends them to the selected printer.
  • Print Sends the input files to the selected printer and executes the print operation.
  • Close Closes the files after printing.

Failures and Recommended Solutions

Operation That Failed

Cause of Failure

Recommended Action

Open

Active security tools or applications.

Disable the security tools and applications and then rerun the task.

 

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and run the task again.

Get Manager

Autodesk Inventor LT installation problems.

Verify that Autodesk Inventor LT is installed and running properly, and then run the task again.

Set Options

Autodesk Inventor LT installation problems.

Verify that Autodesk Inventor LT is installed and running properly, and then run the task again.

Print

Printer problems can cause a failure.

Check the printer settings and connection.

Close

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then rerun the task.

Import Files

Operations results table Operation types lead the rows and operation results lead the columns:

Operation column Specifies the sequence of operations that Task Scheduler performs to process the task.

  • Get Translator Gets the appropriate translator in Autodesk Inventor LT based on the file type to prepare for translating the input file to the output format.
  • Open Opens the file in the current version of Autodesk Inventor LT.
  • Import Translates the input file to the output format.
  • Close Closes the files after importing.

Failures and Recommended Solutions

Operation That Failed

Cause of Failure

Recommended Action

Get Translator

Translator add-in is not loaded.

Open Autodesk Inventor LT and verify that you have the corresponding translator add-in loaded.

Open

Active security tools or applications.

Disable the security tools and applications and then run the task again.

 

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again.

Import

Failure.

Verify that the files to import are compatible with the current version of Autodesk Inventor LT.

Close

Other unfinished operations are running in Autodesk Inventor LT when you begin the task.

Close Autodesk Inventor LT, verify that there is no Autodesk Inventor LT process footprint left in the Task Manager, and then run the task again.

Purge Task

Error messages

Recommended action

Purge success. All unused materials, appearances, and styles in the specified document are purged successfully.
Skipped purge of this document because the document is not checked out. Check out the file or files, and repeat the purge task.
Failed to purge all unused materials, appearances, and styles. Migrate the specified files to your current version of Inventor, and repeat the purge task.
Skipped purge task because all materials, appearances, and styles are in use or referenced. Verifies that the specified document contains no unused or unreferenced materials, appearances, or styles.

Sequential Task

The log detail for sequential tasks is the same as all subtask types. Refer to the log description of each task type.