Synchronizing and comparing views, plots, or animations

When you have multiple windows open, or have split a window into two or four sub-windows, you can synchronize (lock) the views, plots or animations of selected windows to visualize differences between them.

There are several synchronizing options available.

The window synchronization feature has been implemented with flexibility. You can apply any combination of the above to a particular window, and lock/unlock any or all displayed windows. The windows/sub-windows that are synchronized can relate to the same study in the project, or different studies, and these studies can contain the same or different models.

To synchronize windows:

  1. Click on a window to select it.
  2. Select one of the following entries under View tab > Locking panel.
    • Lock View Lock View
    • Lock Plot Lock Plot
    • Lock Animation Lock Animation
  3. Repeat the above steps for each window that you want to synchronize.
  4. If necessary, arrange all windows by clicking View tab > Windows panel > Tile Horizontally or View tab > Windows panel > Tile Vertically.
  5. Select one of the synchronized windows and set up the desired view, plot, and/or animation. The synchronized windows will automatically update the same display aspects that you have locked.
  6. To quickly unlock all windows again, select one of the following entries under View tab > Locking panel.
    • Unlock all Views Unlock All Views
    • Unlock all Plots Unlock All Plots
    • Unlock all Animations Unlock All Animations