Cost Adviser

The Cost Adviser estimates the total production cost per part by calculating the mold usage, material cost, material usage, mold cost, molding cost, and post-molding costs.

Using mold usage, material cost, material usage, mold cost, molding cost, and post-molding costs, a cost per part is determined.

If any of these variables are unknown, the Cost Adviser can still be used to determine the relative impact of varying a known value. For example, changing the material could impact both the material cost and the production time.