Copying Fixtures to a Workshared MEP Project

When you copy fixtures from a linked model to a workshared MEP project, the fixtures are copied to the active workset. To copy each fixture category into a different workset, use the following workflow:

  1. In the MEP project, open the workset to which you want to copy a category of fixtures.
  2. For the linked model, specify default coordination settings, as follows:
    • For the fixture category to copy into the active workset, specify the desired copy behavior, mapping behavior, and type mapping.
    • For all other fixture categories that should not be copied into the active workset, for Copy behavior, select Ignore category.

Related topics