You can select occupancy, lighting, and power schedules for a building type and individual spaces within the model. By default, lighting schedules are used to specify power schedules. You can create separate power schedules, as needed, when power scheduling does not coincide with lighting schedules. The Schedule Settings dialog is accessed from the Building/Space Type Settings dialog. Revit provides default schedules for building and space types. You can modify a default schedule, or create new schedules based on existing default schedules.
Selecting a schedule
Adding a schedule
Copying a schedule
Renaming a schedule
Adjusting an existing schedule
Deleting a schedule
The shaded areas of the graph in the right panel shows active periods. The table below the graph shows the percentage applied to each of 24 hours in the schedule.
The graph shows active periods.
The new schedule is assigned the name of the schedule that was copied with a number appended, and added to the list.
The graph shows active periods.
The graph changes to show the change.
The schedule is removed from the list.