Using this option, you can copy a selected structure story above or below a chosen story. On the Model tab of the Object Inspector dialog, right-click a story, and click Copy story.
In the Copy active story dialog, specify parameters:
Number of repetitions
Direction of copying a story (down or up with respect to a selected story).