Job Monitor Dialog Box

Use this dialog box to monitor the status of translation jobs being performed with the Autodesk® Civil Engineering Data Translator and to download the resulting files for use in AutoCAD® Civil 3D®, Bentley® GEOPAK®, or Bentley® InRoads®.

Tip: Open the Job Monitor dialog box by selecting the Show Job Monitor command. In Toolspace, on the Toolbox tab, expand Subscription Extension Manager Autodesk®Civil Engineering Data Translator 2015, and then double-click Open Job Monitor.

Job Monitor Controls

Job Monitor Configuration
Opens the Job Monitor Configuration dialog box, where you can specify the following:
  • Whether you want jobs to be deleted automatically from the Job Monitor dialog box and from the cloud after downloading them.
  • Whether you want to be prompted for a download location for the translation results or whether you want the results to always be downloaded to a specified folder.
Help
Displays Help for the Job Monitor.
Delete
Deletes selected jobs from the Job Monitor dialog box and from the cloud. You can use Ctrl+click, Shift+click, or Ctrl+A to select multiple jobs to delete.
Note: Jobs are automatically deleted from the Job Monitor dialog box and from the cloud after seven days. To delete jobs before seven days have occurred, you can use the Delete option or you can select the Delete Jobs Automatically After Download check box in the Job Monitor Configuration dialog box.
Refresh
Refreshes the display of the Job Monitor dialog box when clicked. This button is not available if the Auto-Refresh check box is selected.
Auto-Refresh
Refreshes the display of the Job Monitor dialog box automatically when selected. When you select this check box, the Refresh button becomes unavailable for selection.

Job Monitor Columns

Job
Displays the name of the file selected for translation.
Type
Displays the type of translation job performed based on the command that was used and the source file that was selected.
Status
Displays the current status of the translation job.
Result

Displays links you can use to download the files when the translation process is complete, and to associate profiles with alignments when the first stage of translating a GPK file is complete.

Note: Two stages are required for converting GEOPAK GPK files that contain alignments and profiles:
  1. After you use the Import Bentley GEOPAK Project Data command and select a GPK file to be translated, (Stage 1/2) will be displayed as part of the information in the Status column.
  2. When stage 1 is complete, you can initiate stage 2 of the conversion by clicking Configure Mapping in the Result column. When you click Configure Mapping, the Profile to Alignment Mapping dialog box is displayed. Use the Profile to Alignment Mapping dialog box to associate the profiles with the alignments and click OK. When the job has completed, Complete (Stage 2/2) is displayed in the Status column. Click Download in the Result column to download the files.

Depending on the type of job performed, and the data available in the source file, different file types are created during the data translation process. For more information, see To Translate AutoCAD Civil 3D Files to Files that Can Be Used in Bentley GEOPAK and Bentley InRoads and To Translate AutoCAD Civil 3D Files to Files that Can Be Used in Bentley GEOPAK and Bentley InRoads.

Open Folder
Opens the folder in which the files were downloaded. This column is empty if files have not yet been downloaded.
SubmitTime
Displays the time that the translation job was submitted.
UpdateTime
Displays the time that the status of the translation job was updated.