Test the balanced runner system

Test the runner system that you have balanced in the previous task.

  1. Select the Runner Balance tab from the Summary pane.
  2. Click Perform Fill analysis to start the analysis. When the analysis is complete a dialog appears.
  3. Click OK.
  4. Click Fill time from the results section of the Study Tasks pane. The result plot shows the position of the flow front at regular intervals as the cavity fills.

    Note that both cavities are filled at the same time.

    The flow is now balanced .

Note: If you wish, you can now adjust the size of the runners in the Diameter drop-down list of the Edit Properties dialog to better fit your tooling constraints.