The cycle time is the time taken to produce a molded part, which is measured from the start of injection until the end of clamp open time. High cycle times reduce productivity and increase costs.
There will always be a compromise between uniform cooling to assure part quality and fast cooling to minimize part costs. The function of the part will determine whether speed or quality is more important.
All of these remedies should be evaluated in conjunction with each other, and with the quality and cost requirements of the part. Compromises may be necessary.