To prepare static work packages for time-based clashing
- Each static work package that you want to use needs to be modelled in the project model covering the area or volume required; for example, you can use semi-transparent blocks.
- These static packages must be added as tasks to the TimeLiner schedule.
- Extra task types must be added to TimeLiner (on the Configure tab) to represent different types of static packages. You also need to configure the appearance for each added task type.