Use the Copy/Monitor tool when
- The architectural team, the structural team, and the engineering team use Revit software.
- Each team must be informed of changes to levels, grids, and other elements.
- The teams will link project files to work on the same building design. Each team maintains its own edition of the project file and uses Revit software to develop the design for their discipline. Each project file is linked to the other project files to share information about changes to monitored elements in the building design. (For an alternative method, see About Copy/Monitor and Workshared Projects.)
Sample workflows:
- The architect designs the architectural model.
- The structural engineer creates an empty structural project and uses Copy/Monitor to copy levels and grids from the linked architectural model, providing a starting point for the structural design.
- The architect links the structural model into the architectural project to monitor levels and grids.
- Whenever the architect or structural engineer moves or changes a level or grid, the other team member is notified of the change.
- The mechanical engineer creates an empty mechanical project and uses Copy/Monitor to copy levels from the linked architectural model, providing a starting point for the mechanical design.
- Whenever the architect moves or changes a level, the mechanical engineer is notified of the change.