The following table summarizes the setup tasks required to prepare a Gas-assisted Fill+Pack analysis of a non fiber-filled, or fiber-filled thermoplastic material.
Optional setup tasks
| Setup task | Analysis technology |
|---|---|
| Overflow wells-gas injection molding |
|
| Venting locations |
|
| Valve gates |
|
| Cavity/core side mold temperatures 3 |
|