Tasks to set up a thermoplastics injection molding analysis

There are several setup tasks required to prepare a thermoplastics injection molding analysis. Either follow the buttons on the Home tab of the ribbon UI, or follow the order of items in the Study Tasks pane. When all the items in the Study Tasks pane have check marks against them, the analysis is ready to launch.

Setup task Analysis technology
Select the Molding process Midplane Dual Domain
Mesh the model Midplane Dual Domain
Check the mesh before analysis Midplane Dual Domain
Select an analysis sequence Midplane Dual Domain
Select a material 1  MidplaneDual Domain
Set an injection location Midplane Dual Domain
Set the velocity/pressure switchover point Midplane Dual Domain
Enter the process settings Midplane Dual Domain
1 Select a fiber filled material to run a Fiber orientation analysis.