Format a Schedule on a Sheet

Change the attributes that control the display of a schedule on a sheet, including grid lines and text attributes.

The following procedure assumes that you have added a sheet to a project and placed a schedule on the sheet.

Video: Modifying Schedules

  1. In the Project Browser, under Schedules/Quantities, click the schedule name.
  2. On the Properties palette, for Appearance, click Edit.
  3. On the Appearance tab of the Schedule Properties dialog, define the settings as desired.

    The Appearance options affect the display of the schedule on sheets only. They do not affect the display in the schedule view.

  4. Click OK.
  5. Open the sheet to see the results.