You can select occupancy, lighting, and power schedules for a building type and individual spaces within the model.
By default, lighting schedules are used to specify power schedules. You can create separate power schedules, as needed, when power scheduling does not coincide with lighting schedules. The Schedule Settings dialog is accessed from the Building/Space Type Settings dialog. Revit provides default schedules for building and space types. You can modify a default schedule, or create new schedules based on existing default schedules.
Select a schedule
 .
. The shaded areas of the graph in the right panel shows active periods. The table below the graph shows the percentage applied to each of 24 hours in the schedule.
Add a schedule
 , and in the Name dialog, enter a name for the new schedule.
, and in the Name dialog, enter a name for the new schedule. The graph shows active periods.
Copy a schedule
The new schedule is assigned the name of the schedule that was copied with a number appended, and added to the list.
 , and adjust the values for Factors (0.00% - 100.00%) associated with each hour in the schedule.
, and adjust the values for Factors (0.00% - 100.00%) associated with each hour in the schedule. The graph shows active periods.
Rename a schedule
 , and in the Name dialog, enter a name for the new schedule.
, and in the Name dialog, enter a name for the new schedule. Adjust an existing schedule
The graph changes to show the change.
Delete a schedule
 , and in the confirmation dialog, click Yes.
, and in the confirmation dialog, click Yes. The schedule is removed from the list.