After creating mass floors, create a mass floor schedule to assign usages or to analyze the design.
If you change the shape of the mass, the schedule updates to reflect the changes.
Create panel
Schedules drop-down
If Mass Floor does not display by default, select Show model categories in this view. For Filter list, select Architecture.
See Refine a Schedule.
The schedule displays in the drawing area. If you included the Usage field in the schedule, you can assign a usage to each mass floor in the schedule.
