Use this procedure to copy a construct to multiple levels. 
Copying constructs to levels is an easy way to fill multi-story buildings with content. You draw the construct for the first level, and then create a copy of that construct for each level you select. 

Copying constructs to all levels schematic
 
- On the Quick Access toolbar, click Project Navigator 
.  
- On the Constructs tab, select the construct to copy to multiple levels, right-click, and click Copy Construct to Levels. 
 
- Select the levels on which to create a copy of the construct. 
Note: The level on which the original construct is situated is selected by default. You cannot clear the selection here. 
  
- Click OK. 
A new construct is created for each level selected. The level number is appended in brackets after the construct name. 
  
Note: To rename a copied construct, select it in the Drawing Explorer, right-click, and click Rename.