To Drag and Drop Sets onto a Task

To drag and drop sets onto a task

  1. If the TimeLiner window is not already open, click Home tab Tools panel TimeLinerTasks tab.
  2. Select the desired set in the Sets window.
  3. Drag and drop the selected set onto the required task in the TimeLiner Tasks tab. Any existing attachments will be overwritten with the dragged sets.
    Note: Sets can be dragged onto a task in the Tasks area or in the Gantt chart.