You can manually set up a correspondence between phases in the host model and phases in the linked Revit model.
Note: These instructions apply to linked Revit models. They do not apply to linked IFC models.
To map phases in the linked model
- In the drawing area of the host model, select the linked Revit model.
- Click Modify | RVT Links tabProperties panel (Type Properties).
- In the Type Properties dialog, find the Phase Mapping parameter and click Edit.
- In the Phases dialog, select the appropriate mapping options for each phase, and click OK.
- Click OK to exit the Type Properties dialog.
To apply phase mapping in the host model
- Click View tabGraphics panel (Visibility/Graphics).
- In the Visibility/Graphics dialog, click the Revit Links tab.
- Click the button in the Display Settings column for the linked Revit model.
- In the RVT Link Display Settings dialog, on the Basics tab, select By Host View or Custom.
If you select Custom, for Phase, select By Host View.
- Click OK twice to exit the Visibility/Graphics dialog.