Connect compatible air terminals and air handling equipment to provide the heating and cooling required for the project.
Use the Heating and Cooling Loads report to determine the capacity for air terminals and equipment. Place air terminals and air handling equipment in the plan.
Assign grills, air terminals and air handling equipment to supply, return, and exhaust systems.
Use Generate Layout tools to create and route ductwork connecting your air terminals and air handlers.
Change the routing and manually adjust ductwork to avoid obstructions.
If necessary, justify sections of ductwork.
Revit sizing tools let you automatically specify duct sizes that provide the correct flow throughout your systems.
You can create groups of components to replicate similar systems in other spaces or on other levels.
Check the connectivity throughout your systems.
Use the system inspector to verify flows.