Use this dialog box to update project points with changes that you have made.
You must check the points in from the same drawing that you checked them out from.
Lists the project points to be checked in to the project.
Specifies a comment to be associated with the point database for this operation. This comment can be viewed in the Autodesk Vault tool by a system administrator.
Specifies additional actions to be taken after the points are checked in.