If the points in the drawing are out-of-sync with the survey database, you can update them to the values in the survey database.
The points in the drawing and point database are updated with the values from the survey database. Points that are not referenced in the survey database are not affected by the Update command.
The points will not be updated if the points reside on a locked layer.