About Using Vault With Plan Production Tools

This section describes how to use Autodesk Vault with plan production tools.

You may want to manage the objects and files that are both consumed (used) by and created from the plan production tools with Autodesk Vault. If you choose to do so, you will be using an efficient mechanism for maintaining your organization’s standards for plan set drawing templates.

Note: Plan production integration is available only with paid versions of Vault.

If you are saving sheets to the current drawing file, and the current drawing file is already in the vault, that drawing file cannot be checked in to vault automatically. This must be done by you.

The Add To Autodesk Vault check box is not available for editing (grayed out) when sheets are being saved to the current file. In other words, when All Layouts In The Current Drawing is selected on the View Frame Group And Layouts page in the Create Sheets wizard, the Add To Autodesk Vault option is also not available (grayed out).

Note: Only users with the role of either Document Editor (Level 1), Document Editor (Level 2), Document Manager (Level 1), or Document Manager (Level 2) can use the plan production tools with a Vault project.