There are a variety of options available to control the velocity/pressure switch-over point.
Select this option if you want the flow simulation to estimate an acceptable time to switch from velocity to pressure control. The switchover will occur early enough to avoid an end-of-fill pressure spike. The transition point is selected such that if the ram stopped instantaneously, there would be enough melt decompression in the runner, gate and cavity to just fill the cavity. This can be imagined as a scenario in which the injection flow suddenly stops, but the polymer keeps flowing within the cavity, with no short shot, until pressure everywhere reaches zero.
Specifies that the switch-over from filling to packing will occur when a particular percentage of the cavity volume is filled. By default, this percentage is 99%.
Specifies that the switch-over from filling to packing will take place when the machine reaches a specified injection pressure.
Specifies that the switch-over from filling to packing will take place when the machine reaches a specified hydraulic pressure.
Specifies that the switch-over will occur when the clamp force reaches a specified limit.
Specifies that the switch-over from filling to packing will occur when a specified pressure is reached at a specified location on the mesh.
Specifies that the switch-over from filling to packing will take place at the specified time from the beginning of the cycle.
Select this option if you want to specify one or more of the switch-over criteria listed above. In this case velocity/pressure switch-over will occur as soon as one of the set criteria is met.