To draft and edit using spec driven P&IDs

With spec driven P&ID set on, you select a pipe spec to use.

  1. Select Project Manager.
  2. Click Pipe Specs.
  3. Highlight the spec you want to work with from the list.

    Note the Details pane that lists the file location for the spec and reference catalogs used. You can select the Preview button to view the Spec Sheet.

  4. Right-click and select Set as Current Spec to use the highlighted pipe spec.

    The Pipe Spec Viewer is displayed on double click.