To Move Multiple Part-Based Pressure Network Parts

  1. Select a pressure network. The Pressure Networks contextual ribbon tab is displayed.
  2. On the Modify panel, click Edit Network Plan Layout Tools Find.
  3. Click Move Parts Find.
  4. Select the connected parts to move.
  5. Select the base point and a destination point for the selected parts.

    Selected parts remain connected after the move. Lengths of unselected connected pipes may change as a result of the move.