Use this tab to change a site plot’s analysis type, its start point, its segment process-order, or to view analysis results.
Specifies that Inverse analysis type is used for the plot.
Inverse analysis provides a sequential report of directions and distances, start and end coordinates, curve data for each plot segment starting at a specified Start Point (SP), and plot area.
Specifies that Mapcheck analysis type is used for the plot.
Mapcheck analysis provides the same information as Inverse analysis, except that all start and end coordinates for each plot segment are computed relative to the coordinates of the SP and the previous segment, using the labeled precision of the plot segment’s direction and distance/curve data. Therefore, error is introduced and accumulated so that the coordinates of the last segment will not equal that of the SP. This is termed ‘error of closure’. Mapcheck reports check the plotted drawing for omissions of segment labels to avoid errors that may be introduced into legal documents, such as deed descriptions.
Enables map check across chord. This setting is available only if Mapcheck Analysis is selected.
If mapcheck across chord is enabled, the Mapcheck traverse is calculated for curve segments using their chord length. Otherwise, it is calculated using their curve length.
Specifies the site plot boundary’s initial node (start point of its initial segment).
Selects a new start point. Click the button and click a site plot node in the drawing.
If selected, segments are processed in counter-clockwise order.
(Not labeled) Displays analysis results in the lower portion of the dialog box.