To Modify A Large Number of Project Points

  1. Create a new, empty drawing.
  2. In Toolspace, on the Settings tab, under the Point Styles collection, right-click the StandardEdit.
  3. On the Display tab, to turn off the display of point symbols, click in the Visible column for Marker so that the light bulb icon is not available.
  4. To turn off the display of point labels, click in the Visible column for Label so that the light bulb icon is not available.
  5. Click OK.
  6. In Toolspace, on the Prospector tab, under the Point Groups collection, right-click the _All PointsProperties.
  7. In the Point Group Properties dialog box, on the Overrides tab, in the Overrides column, select the Standard point style. In the Properties column, select the check box next to Point Style.
  8. In the Overrides column, select the Standard point label style. In the Properties column, select the check box next to Point Label Style.
  9. Click OK.
  10. If the drawing has more than one point group, move the _All Points point group to the top of the point group display order. For more information, see To Change the Point Group Display Order.
  11. Check out the project points to the drawing.
    Note: To quickly check out all the project points, right-click the _All Points point group in the drawing and select Check Out Points.
  12. In the drawing, edit the points using either a point utility, the Point Editor, or the Prospector Points list view.
    Note: For information about changing a point property such as elevation to the same value for every point in the Point Editor or the Points list view, see To Work With Toolspace List Views.
  13. Check the points in to the project. Do not keep them checked out to the drawing.
    Note: To quickly select all the points in the drawing for checking in, right-click the _All Points point group and select Check In Points.
  14. Delete the throw-away drawing.