To Regenerate the View Drawings in a Project

Use this procedure to regenerate view drawings in the project when the content, levels, or divisions have changed. When you regenerate a view drawing, the external references used to generate it are attached, detached, or reloaded as needed.

  1. On the Project Navigator palette, click the Views tab.
  2. On the toolbar at the bottom of the tab, click the button.

    All view drawings in the project are updated with the changed constructs.

Alternatively, you enter aecregenerateprojectviews on the command line to refresh the project.