This task shows how to add a schedule to its own drawing, and then link it to an external drawing that contains the parts you want to schedule. If you want to have separate sheets for plan drawings and schedule drawings, it is recommended that you add a schedule to its own drawing. This alleviates the need to place the same drawing on 2 separate sheets, and then manipulating the model space view so that only the desired portion of the drawing is visible on the sheet. This will also reduce the file sizes of your sheets.
If you are using Project Navigator to manage project drawings, you can create a new general view drawing, and add the schedule to it. You link the schedule to the construct drawing that contains the parts you want to schedule. After you update the schedule, you can place its view drawing on a sheet.
The schedule table displays the data from the parts in the external drawing.