Import points from the current drawing into the survey database and survey network, as control points or non-control points, and specify options for linework processing.
Specifies the imported points as either control points or non-control points in the network.
Specifies the name of the figure prefix database. Select the database from the list.
Specify Yes to process linework during the file import.
Specifies the linework code set that is used in the linework processing.
Specifies the order in which survey point descriptions are processed to determine linework connectivity. Select one of the following:
Specifies the name of the import event that is created by the import command. By default the import event name is the name of the imported file.
Optionally, specify a description for the import event.
Specifies that an offset is applied to point identifiers before the points are imported into the survey database.
Specifies the offset value that is applied to the point identifier. For example, if the offset value is 1000, point number 101 is renumbered to 1101, or point name KC101 is renamed as KC101.1000.