In this exercise, you will add point data to the project.
To create project points, you first create a drawing that contains the points. When you are ready to share the points with others, you use the Add To Project command to add the points to the project point database. The project points can then be accessed by others.
After you create project points with the Add To Project command, a local copy of the points remains in the drawing. The icons displayed in the points list view indicate the state of a point with respect to the project.
In this exercise, you will add points to the project from the drawing Project-XGND.dwg, which has already been added to the project.
This exercise continues from the Creating, Referencing, and Modifying Project Object Data tutorial.
Add points to the project
 Tutorial Vault Project
 Tutorial Vault Project  Drawings
Drawings Source Drawings
Source Drawings Surfaces folder. Right-click drawing Project-XGND.dwg, and click Open (Read-Only).
Surfaces folder. Right-click drawing Project-XGND.dwg, and click Open (Read-Only). This operation may take a few moments.
You can also add all points in a drawing to a project by expanding the Point Groups collections, right-clicking the _All Points point group, and clicking Add Points To Project.
If you are prompted to check out the drawing, click No.
 icon is now displayed next to each point. The icon indicates that it is a project point that is available to be checked out.
 icon is now displayed next to each point. The icon indicates that it is a project point that is available to be checked out. To continue this tutorial, go to Exercise 2: Checking Out and Modifying Project Points.