The following table summarizes the setup tasks required to prepare a Co-injection analysis of a non fiber-filled, or fiber-filled thermoplastic material.
| Setup task | Supported for analysis technology |
|---|---|
| Specifying the velocity/pressure switchover point | ![]() |
| Editing occurrence number properties | ![]() |
| Setting valve gates | ![]() |