The following table summarizes the setup tasks required to prepare a Gas-assisted Fill+Pack analysis of a non fiber-filled, or fiber-filled thermoplastic material.
| Setup task | Analysis technology |
|---|---|
| Overflow wells - gas injection molding | ![]() |
| Venting locations | ![]() |
| Valve gates | ![]() |
| Cavity/core side mold temperatures 3 | ![]() |
[1] The gas channel mesh must pass diagnostic tests.
[2] Gas injection control parameters can be set at the same time as the gas entrance.
[3] Manual core/cavity mold temperature assignment is only relevant when not performing a Cool analysis.