After you generate an isometric drawing, you can review the creation details to check for errors and warnings and to verify the location and number of Piping Component Files (PCF) created. While a job is being processed in the background, you can check its status by placing the cursor over the isometric icon on the right side of the status bar.
- In the status tray, double-click the isometric icon
.
- The Isometric Creation Results dialog box displays.
Note: Only isometric details from the current session are accessible by clicking the status tray icon. To view details from a prior session, review the isometric log file.
- In File Explorer, navigate to the Drawings folder that corresponds to the iso style (check, stress, or final) used to created the isometric drawing.
- In the File Explorer selection box, right-click the log file and click Open.