Use the individual volume and total excavation information to know the exact amount of soil to be removed from the toposolid modeling.
Examples:
- Floor is a cutter element. In the Properties Palette Floors Dimensions, the Excavation Volume on Toposolid parameter refers to the portion to be excavated from the Toposolid
- Mass is a cutter element. For the mass element, the Excavation Volume on Toposolid parameter shows the portion of soil that has been removed from the toposolid.
- When the toposolid is being cut by another element there are two parameters:
- View the Individual Excavation Volume dialog. The dialog lists all elements cutting the Toposolid.
- The Total Excavation Volume shows how much soil has been taken out of this Toposolid instance by all cutting elements.
You can also create schedules for those parameters:
For a toposolid being cut by another element: Toposolid Total Excavate Schedule that has the Total Excavation Volume parameter.
For an element that is cutting a toposolid: Excavate Multi-Category Schedule, and filter by the Excavation Volume.