Shutdown Simulations allow assessment of the impact of watermain breaks and shutdowns on the system without the need to make changes to the Network or Control Data.
A selection of links to be closed and the outage period of the links is defined. Level of Service criteria are also set prior to running the simulation for use in the production of Service Level Reports on completion of the simulation.
To set up a Shutdown Simulation:
The simulation will be run with the selected links closed at the Link Outage Period defined. If the Show Service Level Report at end option is checked, the Service Level Summary dialog will be displayed when the simulation has completed, with the Service Level Criteria set as specified in the Shutdown run.
Service Level Reports can also be created in the usual way from the Grid Reports | Service Level and Grid Reports | Service Level Summary options on the Results menu. When creating a Service Level Report from a Shutdown run, the Level of Service Criteria used in production of the report will be the criteria specified in the Shutdown run by default.