You can mark the fabrication status of a connection and transfer it to other connections.
The fabrication status is different from the design status (which is a "calculation" status). Each status is assigned a color:
) or Create by Template, Multiple (
) commands, the original connection approval status is not transferred - it will be Not Set.
) or Create Joint in a Joint Group, Multiple (
) commands, the master connection approval status is transferred - the new connection approval status will be the same as the master connection approval status.
) command, the master connection approval status is transferred - the new connection approval status will be the same as the master connection approval status.
) command, the approval status does not change. If a connection is removed from a connection group (_AstorDetachSlaveJointFromMaster), the detached connection approval status will remain the same as before.