The following table summarizes the setup tasks required to prepare a Co-injection analysis of a non fiber-filled, or fiber-filled thermoplastic material.
Setup task | Supported for analysis technology |
---|---|
Specifying the velocity/pressure switchover point | ![]() |
Editing occurrence number properties | ![]() |
Setting valve gates | ![]() |