You can now use system categories and subcategories that were previously not available in multi-category schedules and material takeoffs.
This feature enhancement improves Revit scheduling by including additional system categories in multi-category schedules for Schedule/Quantities and Material Takeoffs. When creating multi-category schedules, more categories and sub-categories, are available to choose from. This improvement enhances the ability to schedule system categories.
The following system categories and sub-categories appear in multi-category Schedules/Quantities.
| Domain | Category | Sub-category |
|---|---|---|
| Architecture | Wall | Wall Sweep |
| Architecture | Roof | Fascia, Gutter, Roof Soffits |
| Architecture | Floor | Slab Edge |
| Architecture | Railings | |
| Architecture | Ramps | |
| Architecture | Stairs | Landings, Runs, Supports |
| Architecture | Ceiling | |
| Architecture | Curtain Wall Mullions | |
| Architecture | Building Pads | |
| Structure | Structure Area Reinforcement | |
| Structure | Structure Beam System | |
| Structure | Structure Stiffeners | |
| Structure | Structure Path Reinforcement | |
| MEP | Duct System | |
| MEP | Electrical Circuits | |
| MEP | Piping System | |
| MEP | Switch System |
The following categories and sub-categories are included in Material Takeoffs for single-category and multi-category schedules.
This feature was suggested by customers on the
Ideas forum and is described on the
product road map.