Space Type Data

The following tables list the default settings for space types in Vasari.

Active Storage

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.8
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Active Storage - Hospital/healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Air/Train/Bus - Baggage Area

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Airport Concourse

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Atrium - Each additional floor

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 33.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.2
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Atrium - First 3 floors

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 33.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Penitentiary

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.7
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Exercise Center

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Gymnasium

Parameter Default Value
Occupancy Schedule Common Commercial 7 am - 6 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.4
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Sports Arena

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.4
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Convention Center

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.7
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Audience/Seating Area - Motion Picture Theatre

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Audience/Seating Area - Performing Arts Theatre

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 2.6
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Audience/Seating Area - Religious

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 120
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 1.7
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Audience/Seating Area - Police/Fire Station

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 50.0
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Audience/Seating Area - Courthouse

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Audience/Seating Area - Auditorium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Bank Customer Area

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 1.49
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Banking Activity Area - Office

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.5
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.3
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Barber and Beauty Parlor

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 2
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Card File and Cataloguing - Library

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Classroom/Lecture/Training - Penitentiary

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 65.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Classroom/Lecture/Training

Parameter Default Value
Occupancy Schedule School 8 am - 9 pm
Power Schedule School 7 am - 9 pm
People/100 sq. M. 65.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Confinement Cells - Penitentiary

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Confinement Cells - Court House

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Conference/Meeting/Multipurpose

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 50.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Corridor/Transition

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.5
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Corridor/Transition - Manufacturing Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 00.5
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Corridor w/Patient Waiting Exam - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Court Sports Area - Sports Area

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.3
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Courtroom - Court House

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.3
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Department Store Sales - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.14
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Detailed - Manufacturing Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.1
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dining Area

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Dining Area - Hotel

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Dining Area - Family Dining

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 2.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Dining Area - Lounge/Leisure Dining

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dining Area - Motel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dining Area - Transportation

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dining Area - Penitentiary

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dining Area - Civil Services

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 275
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dormitory Bedroom

Parameter Default Value
Occupancy Schedule Home 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.11
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Dormitory Study Hall

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.11
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Dressing/Locker/Fitting Room - Gymnasium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dressing/Locker/Fitting Room - Court House

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Lighting Schedule Office Lighting 6 am - 11 pm
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dressing/Locker/Fitting Room - Performing Arts Theatre

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dressing/Locker/Fitting Room - Auditorium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Dressing/Locker/Fitting Room - Exercise Center

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Electrical/Mechanical

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.5
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Elevator Lobbies

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.2
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Emergency - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.7
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Equipment Room - Manufacturing Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Exam/Treatment - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.5
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Exercise Area - Exercise Center

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 710
People Latent Heat Gain (Btu/hr) 1090
Lighting Load Density (W/sq. ft.) 0.93
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Exercise Area - Gymnasium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 710
People Latent Heat Gain (Btu/hr) 1090
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Exhibit Space - Convention Center

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 50.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Fellowship Hall - Religious Buildings

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 120.0
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Fine Material - Warehouse

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Fine Merchandise - Sales Area Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.14
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Fire Station Engine Room - Police Fire Station

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.8
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Food Preparation

Parameter Default Value
Occupancy Schedule Restaurant Lunch and Dinner
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Garage Service/Repair - Automotive Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.7
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

General High Bay - Manufacturing Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.7
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

General Low Bay - Manufacturing Facility

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

General Exhibition - Museum

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 40.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Hospital - Nursery - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Hospital - Medical Supplies - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Hospital/Radiology- Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.4
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Hotel/Conference Center - Conference/Meeting

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 50.0
People Sensible Heat Gain (Btu/hr) 225
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Inactive Storage

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.3
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Judges Chambers - Court House

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 50.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Laboratory - Office

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Laundry - Ironing and Sorting

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 475
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Laundry - Washing - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 275
People Latent Heat Gain (Btu/hr) 475
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Library - Audio Visual - Library - Audio Visual

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Living Quarters - Dormitory

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Residential Lighting All Day
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Living Quarters - Motel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.11
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Living Quarters - Hotel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 155
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby - Religious Building

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby - Motion Picture Theatre

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby - Auditorium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby - Performing Arts Theatre

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 3.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lobby - Post Office

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.3
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Lobby - Hotel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Lounge or Recreation

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.21
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Mail Concourse Sales Area - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 40.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.7
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Mass Merchandising Sales Area - Retail

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.11
Power Load Density (W/sq. ft.) 0.1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Medium/Bulky Material - Warehouse

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Merchandising Sales Area - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.14
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Museum and Gallery - Storage

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.84
Power Load Density (W/sq. ft.) 0.2
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Nurse Station - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.3
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Office - Enclosed

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.3
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Office - Open Plan

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.3
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Office - Common Activity Areas - Inactive Storage

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 3.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.28
Power Load Density (W/sq. ft.) 0.2
Electrical Equipment Radiant Percentage 0.3
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Operating Room - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.2
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Other Televised Playing Area - Sports Arena

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 150.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Parking Area - Attendant Only - Parking Garage

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.19
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Parking Area - Pedestrian - Parking Garage

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.2
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Patient Room - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.7
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Personal Services Sales Area - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.14
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Pharmacy - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Physical Therapy - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Playing Area Gymnasium

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 710
People Latent Heat Gain (Btu/hr) 1090
Lighting Load Density (W/sq. ft.) 1.4
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Plenum

Parameter Default Value
Occupancy Schedule Cooling/Heating Off 24 hrs
Power Schedule Cooling/Heating Off 24 hrs
People/100 sq. M. 00
People Sensible Heat Gain (Btu/hr) 0
People Latent Heat Gain (Btu/hr) 0
Lighting Load Density (W/sq. ft.) 0
Power Load Density (W/sq. ft.) 0
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0
Carpet (Y/N) N

Police Station Laboratory - Police/Fire Stations

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.39
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Public and Staff Lounge - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 25.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.84
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Reading Area - Library

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Reception/Waiting - Transportation

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Reception/Waiting - Motel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Reception/Waiting - Hotel

Parameter Default Value
Occupancy Schedule Hotel 24 hrs
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 30.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.1
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Recovery - Hospital/Healthcare

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.8
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Restoration - Museum

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 40.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.7
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Restrooms

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.9
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Ring Sports Area - Sports Arena

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 70.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.7
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Sleeping Quarters - Police/Fire Station

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 105
Lighting Load Density (W/sq. ft.) 0.3
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Sorting Area - Post Office

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 5.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.2
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Specialty Store Sales Area - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 15.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.14
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Stacks - Library

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.7
Power Load Density (W/sq. ft.) 1.5
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Stairs - Inactive

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.56
Power Load Density (W/sq. ft.) 0.2
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Stairway

Parameter Default Value
Occupancy Schedule Common Office 8 am - 5 pm
Power Schedule Office Lighting 6 am - 11 pm
People/100 sq. M. 10.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 0.6
Power Load Density (W/sq. ft.) 0.3
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Supermarket Sales Area - Retail

Parameter Default Value
Occupancy Schedule Retail Facility 7 am - 8 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 8.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.1
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Terminal - Ticket Counter - Transportation

Parameter Default Value
Occupancy Schedule Healthcare Facility 8 am - 9 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 100.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.5
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y

Workshop - Workshop

Parameter Default Value
Occupancy Schedule Warehouse 7 am - 4 pm
Power Schedule Warehouse 7 am - 4 pm
People/100 sq. M. 20.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 1.9
Power Load Density (W/sq. ft.) 1
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) N

Worship - Pulpit Choir - Religious

Parameter Default Value
Occupancy Schedule Large Assembly Hall 8 am - 10 pm
Power Schedule Retail Lighting 7 am - 8 pm
People/100 sq. M. 120.0
People Sensible Heat Gain (Btu/hr) 250
People Latent Heat Gain (Btu/hr) 200
Lighting Load Density (W/sq. ft.) 2.4
Power Load Density (W/sq. ft.) 0.54
Electrical Equipment Radiant Percentage 0.5
Infiltration Flow (CFM/sq. ft.) 0.038
Carpet (Y/N) Y