On the Estimate Summary dialog Fixed Costs tab, you can assign costs to particular sections or use them as global Project Preliminaries.
Clicking the New icon displays a drop-down selection of all the database Fixed Costs setup from the previous example.
Fixed Costs can be applied to a Preliminary section created to store all costs inside, as shown above, or can be section specific; for example, Equipment hire for higher floors of the building.
To access Fixed Costs settings in the Database, click Database Costing, and then click the Fixed Costs option in the left pane. For more information, see Fixed Costs.