Pattern Tab

To Run Demand Analysis

Check Simulation Pattern Time Step and unit to see if it is set correctly. The result pattern uses these parameters to determine the output data interval. Do not confuse meter data interval with the output data interval.

DemandAnalyst will produce a pattern and base demand after the analysis run completes.  Meters in the same usage have one pattern and a list of base demands per junction. 

Base Demand in a usage is the sum of all base demands for each meter with the same pattern.