Learn about new features in Flow Production Tracking. For technical details, see release notes.
8.90 | Format notes with a text formatting toolbar in the Review Notes app.
8.90 | Host your new site in Europe to reduce latency for users in that region.
8.90 | Compare permission roles side by side and see exactly where they differ.
8.90 | Ask Autodesk Assistant how to do something, or ask about your own site's data, without digging through help, filters, or reports.
8.89 | Copy a page filter and paste it onto another page of the same type, instead of rebuilding its conditions.
8.89 | Control whether members receive email when work is assigned or addressed to a group.
8.89 | Make key fields stand out on a Canvas page by setting a larger field size or a value text color in the Fields widget.
8.89 | Save which Note fields appear in the Review Notes app Send All Notes dialog, per project or as a site-wide default.
8.88 | Resize Task bars and split segments from their edges, drag to link Tasks, and see when the Gantt is still updating.
8.88 | Use linked entity filters to control which linked values appear when graphing by a multi-entity field.
8.88 | Exclude specific statuses from status summary calculations so roll-ups accurately reflect your studio's progress.
8.87 | Reach a field one level deeper with nested linked fields in Calculated Fields.
RV 2026 | Preview media at a glance with scrubbable thumbnails in the RV Session Manager.
8.87 | Mark up frames with shapes and text.
8.87 | Filter tasks within a pipeline step by status, assignee, or other attributes to focus on what matters.
8.87 | See a live count of selected records in the grid footer to quickly track how many rows you have selected.
8.87 | Administrator can now monitor email delivery status and throughput in the Site Activity Monitor.
8.86 | Your home for reviews.
8.86 | Share cuts from existing projects to animate in context with Maya.
8.85 | Gantt views now load and respond faster, so navigation feels smoother.
8.85 | The View tabs bar can now display more than 6 tabs.
8.85 | Open Notes are now sorted by newest note first.
8.85 | Choose relative labels or absolute calendar dates for grids, thumbnails, and detail views.
8.85 | Renamed column headers now show an asterisk (*), and a tooltip displays the original name.