Writes changes made in the Settings List Utility back to the drawings and project file.
Find
- Click Edit Mode.
- Edit the values or change the drawing order.
- Click OK-Return to Report.
- Click Close.
If you edit the information in the Configuration Report, you have an option to update the project and drawings with the new information. Re-order the lines with the Move Up, Move Down, Move to Top, and Move to Bottom buttons. If you re-order the lines, the order of the drawing list in the project file (.WDP) can be updated to match.
Drawing Order (in .WDP) |
Update the drawing order in the project file (.WDP). |
Section (in .WDP) |
Update the Section data held in the project file (.WDP). |
Sub-Section (in .WDP) |
Update the Sub-Section data held in the project file (.WDP). |
Sheet (%S) (on drawing) |
Update the Sheet (%S) data on each drawing. |
Drawing (%D) (on drawing) |
Update the Dwg no. (%D) data on each drawing. |
IEC Project (%P) (on drawing) |
Update the IEC Project (%P) data on each drawing. |
IEC Installation (%I) (on drawing) |
Update the IEC Installation (%I) data on each drawing. |
IEC Location (%L) (on drawing) |
Update the IEC Location (%L) data on each drawing. |
Description (in .WDP) |
Update the first Description data held in the project file (.WDP). |