About Updating Panel Schedules

Update panel schedules when panels, connected circuits, or devices change. For example, if you add light fixtures to an electrical drawing and connect them to a circuit on a panel, the values in the panel schedule do not update automatically. You must update the panel schedule to reflect the changes to the circuit.

  • To update all panel schedules in the drawing, click View tabAppearance panelRegenerate drop-downRegenerate, or enter re (for REGEN) at the command line
  • To update a selected panel, right-click, and select Update Panel Schedule