Use this dialog box to select the alignments and specify station ranges for an Alignment Stakeout report.
This report lists angle, distance, northing, and easting from the occupied point to each alignment station.
List of Alignments
- Include
-
Specifies the alignments to include in the report. Select a check box to include the alignment.
- Name & Description
-
Displays the name and description of the alignments in the drawing.
- Station Start & Station End
-
Displays the start and end stations for a selected alignment
You can edit these values by highlighting an alignment in the list and adjusting the Report Settings (see below).
Stakeout Options
- Point Occupied
-
Specifies the point from which the angles to the alignment are calculated. You can enter a point number or click
to select a point in the drawing.
- Backsight Point
-
Specifies the backsight point. The backsight point and occupied point cannot be the same point.
- Select Angle Type
-
Specifies the stakeout angle type to use.
- Turned +: Turned angle right
- Turned -: Turned angle left
- Deflect +: Deflection angle right
- Deflect -: Deflection angle left
- Direction: Uses azimuths or bearings
Report Settings
- Start Station & End Station
-
Displays the start and end stations for a highlighted alignment. Click an alignment name in the list to highlight it.
You can edit these values to change the range of stations included in the report. You can enter formatted or unformatted values, such as 2+50.95 or 250.95.
- Station Increment
-
Specifies the station increment to use. For example, specify 50 to report at increments of 50 feet or meters along the alignment.
Note: The increment is applied to all alignments. Station 0+00 is always included in the report. Odd stations are not included if they do not match the station increment. For example, if the increment is 50, and the alignment starts at station -10+00, the report will begin at station 0+00. However, if the alignment begins at station -60+00, the report will begin at station -50+00. - Offset
-
Specifies a distance from the alignment the stakeout report will use in calculations. Enter a negative number to indicate a left offset.
- Save Report To
-
Specifies the name and location of the resulting report.
- Create Report
-
Generates the report and saves it to the specified location.
- Done
-
Closes the dialog box and discards changes to station ranges.